Tick progress
The 60-tick strip from Workflow operations, available as a small framework-free capacity indicator. It changes only the visual shape, not the meaning of the value. Existing labels, status, reset information and series colors stay with the caller.
Fictitious capacity data. Sixty separate ticks use the Workflow-OPS shape; text retains the exact value.
Small value: 0.23% used
Unknown amount: unavailable, not 0%
Use
Import createTickProgress from /lumen-template/tick-progress.js and load /lumen-template/tick-progress.css.
const bar = createTickProgress(host, {
value: 31,
label: 'Weekly capacity used: 31%',
color: '#22a06b'
})
bar.update({ value: 32, label: 'Weekly capacity used: 32%', color: '#22a06b' })
bar.destroy()The default is 60 ticks, 20px high with a 2px gap and 1px corner radius, matching Workflow-OPS. Local CSS properties --tick-progress-color, --tick-progress-track, --tick-progress-height, --tick-progress-gap and --tick-progress-radius adapt to each host. No global palette changes or dependencies are needed.
Exact values and accessibility
A partially filled tick preserves values below one tick, including small monthly spend. Values below 0 or above 100 are visually clamped while the caller's exact text remains unchanged. null, missing and non-finite values render an unavailable strip, never a false zero. Supply an unavailable label in those cases. Known values have role="progressbar" and a bounded 0-100 value; decorative ticks are hidden from assistive technology. This compatibility strip preserves the existing limits panel progressbar role. For a new capacity-only interface, prefer the meter semantics described in Meters and gauges; this visual extraction does not migrate that accessibility contract. The caller owns whether this is capacity used or work completed, its label, and any more detailed valueText.
There is no autonomous animation or polling. Updates are immediate, including with reduced motion. Forced colors use system colors and outlined ticks. This does not replace a native progress element for an unknown-duration task.